ShadowBuys

Federal Register · Regulatory notice

Applications for Amendments to Facility Operating Licenses Involving Proposed No Significant Hazards Consideration Determination and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information

The U.S. Nuclear Regulatory Commission (NRC, the Commission) received, and is considering approval of, two requests to amend eight licenses. The license amendment requests are for Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units 1 and 2; Oconee Nuclear Station, Units 1, 2 and 3; and Fort Calhoun Station, Unit No. 1. For each license amendment request, the NRC proposes to determine that it involves no significant hazards consideration (NSHC). Because the amendment requests contain sensitive unclassified non-safeguards information (SUNSI), the NRC is issuing an order imposing procedures to obtain access to SUNSI for contention preparation by persons who file a hearing request or petition for leave to intervene.

Follow DUK
Became public
Jun 16, 2026
Event / period date
Not stated
Collected
Nov 8, 2026, 7:41 PM EST

Why this is connected

The source explicitly mentions Duke Energy CORP. A mention alone does not establish a financial benefit.

Source evidence

Read the source excerpt or record
arolinas, LLC; Oconee Nuclear Station, Units 1, 2, and 3; Oconee County, SC ------------------------------------------------------------------------ Docket Nos................... 50-413, 50-414, 50-369, 50-370, 50-269, 50[dash]270, 50-287. Application Date............. March 24, 2026. ADAMS Accession No........... ML26083A340. Location in Application of Enclosure 2, Pages 24-26. NSHC. Brief Description of The proposed license amendments would Amendments. revise the thermal hydraulic methodology for the Renewed Facility Operating Licenses for Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units 1 and 2; and Oconee Nuclear Station Units 1, 2 and 3. Specifically, the licensee requests the NRC to review and approve the proposed changes set forth in Revision 4 of DPC-NE-2003-P, ``Core Thermal-Hydraulic Methodology using VIPRE-01,'' Revision 3 of DPC-NE- 2004-P, ``Core Thermal-Hydraulic Methodology using VIPRE-01,'' and Revision 7 of DPC-NE-2005-P, ``Thermal- Hydraulic Statistical Core Design Methodology.'' Proposed Determination....... NSHC. Name of Attorney for Tracey Mitchell LeRoy, Deputy General Licensee, Mailing Address. Counsel, Duke Energy Corporation, 525 S Tryon Street, Charlotte, NC 28202. ------------------------------------------------------------------------ NRC Project Manager, John Klos, 301-415-5136. Telephone Number. -------------------------------

Congressional trading in DUK

These disclosures provide context. Their presence does not establish a link between a trader and the event.

Original documents control. Public records can be amended, and company connections may require interpretation. Nothing here is investment advice.