ShadowBuys

Federal Register · Regulatory notice

Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations

Pursuant to section 189a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular biweekly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person.

Follow DUK
Became public
Oct 14, 2026
Event / period date
Not stated
Collected
Nov 8, 2026, 7:41 PM EST

Why this is connected

The source explicitly mentions Duke Energy CORP. A mention alone does not establish a financial benefit.

Source evidence

Read the source excerpt or record
- Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC ------------------------------------------------------------------------ Docket No.............................. 50-400. Application date....................... August 14, 2026. ADAMS Accession No..................... ML26226A420. Location in Application of NSHC........ Pages 10-12 of the Enclosure. Brief Description of Amendment......... The proposed amendment would modify the Shearon Harris Nuclear Power Plant, Unit 1, Renewed Facility Operating License NPF-63 and Technical Specifications (TSs). Specifically, the proposed license amendment would modify TS \3/4\.7.5, ``Ultimate Heat Sink,'' to include an additional minimum water level limit requirement for each reservoir to be contained within the licensee-controlled Technical Requirements Manual. Additionally, the proposed amendment would also update HNP TS 3/4.7.5 to reflect that either the Auxiliary Reservoir or the Main Reservoir in an operable condition meets the associated Limiting Condition for Operation for the Ultimate Heat Sink. Lastly, the proposed license amendment would modify the Administrative Controls section of the TS to consolidate content from TS Table 6.2-1, ``Minimum Shift Crew Composition,'' related to the responsibility of the person designated for control room command function into TS 6.1, ``Responsibi

Congressional trading in DUK

These disclosures provide context. Their presence does not establish a link between a trader and the event.

Original documents control. Public records can be amended, and company connections may require interpretation. Nothing here is investment advice.